Skip to main content
Taktika

Dynamic risk assessment

What does the term mean

Rapid risk assessment in real time as conditions change.

Dynamic risk assessment is a "field" variant of risk analysis: the situation changes and you continuously reassess what is at risk and how to adjust the procedure (barriers, reinforcements, communication tactics).

Typical triggers

  • The crowd accelerates / pushes (risk of falling and trampling).
  • An aggressive group / weapons / pyrotechnics will appear.
  • Weather or technical problem changes ingress/egress.

Practical meaning

How Dynamic risk assessment applies to a real service

It makes sense mainly when it results in a specific procedure for an object, an event or a team on site.

When is the term resolved

Dynamic risk assessment is mainly handled in practice when briefing the team, preparing an event, evaluating an incident or setting rules for conflict situations.

Common mistakes in practice

The problem arises when the concept is described only in theory and the team does not have clear roles, a communication channel or a boundary for escalation.

What to do in practice

If the term applies to your real operation, it connects to Event security. That is where we deal with the specific space, scope, responsibility and next step before deployment.

Go to service